- Model NO.: LTY-P8670
- Types: Auto Part
- Lead Time: 3-10 Weeks According to Complexity of Mold
- Trademark: Abesttec
- Origin: Dongguan, China
- Material: ABS
- Port: Shenzhen or Guangzhou
- Packaging: Fumigation-Free Wooden Box
- Specification: ISO9001
- HS Code: 8480410010
-
ABS Injection Molded OEM Auto Plastic Injection Parts
Advantages:
1.We are a professional plastic mold and injection moulding parts manufacturer, OEM is available according to the customers' drawings.
2.We own advanced CAD/CAM/CAE/systems and large processing detection equipment.
3.High quality, close tolerance plastic parts production, competitive price and efficient services.
4.Good surface treatment, strict international tolerance standard.
5.Welcome to your drawings or samples for quoting.
What we can guarantee
1.We are a professional plastic mold and injection moulding parts manufacturer, Particularly in plastic medical device area.
2.OEM is available according to the customers' drawings or samples.
3.We own advanced CAD/CAM/CAE/systems for design for both injection mold and plastic part.
4.High quality, close tolerance plastic parts production is very critical for medical device components, competitive price and efficient services also is
Abesttec factory can be 100% cooperate with.
5.Good surface treatment, and fresh plastic material using during the injection process.
Company Name
Abesttec
Part Material
ABS, PC, PP, PE, Nylon, POM, TPU, TPE, PVC, PTFE, PVDF^
Engineering
CAD, UG, ProE, CAD, Solidworks, Mastercam, Cimatron^
Mold Grade
SPI CALSS 101 MOLD, SPI CLASS 102 MOLD
Cycles/Mold Life
One million or more, under 500, 000 ^
Mold Base
LKM, DME, Hasco^
Mold Spare Parts
DME, HASCO, MISUMI, LKM ^standard
Mold Type
Cold runner, hot runner, hot to cold runner, automatic mold, insert mold, over mold, twin-shot mold ^
Hot Runner Brand
Husky, YUDO, Mold Masters, Synventive, Mastip^
Demoulding
Motor, oil cylinder, stripping plate, slides, angel pin, ejector sleeves ^
Equipment
Miller, Gantry Milling, Driller, CNC, high speed CNC, EDM, 2-end, low speed wire cut, CMM,
Lead Time
3-10 weeks according to complexity of mold
Packaging
Fumigation-free wooden box
Main Markets
Medical, Automotive, Plastic Packing, Electronics, Appliances^
Work Flow
(Basic Steps,
We do more than this described)
1.You send us samples or ready drawings
2.We confirm DFM, final drawings with you
3.We start tooling and update tooling progress to you every week
4.Finish tool and tool trial out
5.Send you tool trial samples by DHL, Fedex, TNT, UPS, Aramex, ^
6.Until you confirm samples, we inspection mold, pack it for shipping